Aspley Village Medical Centre, Aspley

Back
Aspley Village Medical Centre, Aspley Thick blue line

Type:

Hydrotherapy pools

Project:

Construction of 2 no. hydrotherapy Pools

Completion:

March 2009

Pool:

Pool 1: Surface area: 99 sq.metres
Volume: 107,000 litres
Pool 2: Surface area: 69 sq.metres
Volume: 107,800 litres

Water Treatement System:

Filtration: 6 no. Poolrite S6000 sand filters
Pumps:6 no. Poolrite SQI600 pumps
Sanitation:Chlorine
PH Control: AcidORP & PH
Monitoring: Aquarius SE100WP
Dosing: Alldos
Heating: 2 no. Raypak 280 commercial

Pool Finish:

Coping: Exfotliated granite
Interior surface: Fully tiled Metz Klinkasire
Handrails: Custom stainless steel
Coping: Exfotliated granite
Interior surface: Fully tiled Metz Klinkasire
Handrails: Custom stainless steel

These gas-heated, fully tiled pools adhere to strict Australian standards for hydrotherapy facilities.

Uniquely located on the first floor of a busy suburban shopping centre, these pools were designed and built for a specialist physiotherapy service, constructed strictly in accordance with the Australian Standard for hydrotherapy pools. The two pools were different in layout and depth, which ensures they provide a range of rehabilitation options. Both pools were gas heated and fully tiled in Metz KlinkerSire.