Construction of 25m pool
March 2005
Filtration: 2 no.Waterco SMDD1400
Sanitation: Chlorine
Waterline: Mosaic
Interior: Epoxy coating
Baldwin Aquatic worked with QBuild (Queensland Department of Public Works) to construct a swimming pool for the Baralaba State School. The 25m, 6 lane, competition-standard pool was built to QBuild’s strict specifications for structure and finish, and was highly praised by both the client and QBuild. Used primarily for competitions, learn-to-swim classes and community recreation, the pool was constructed with two expansion joints, 300mm deep waterline tile band and Kingcrete epoxy pool lining, and incorporates AntiWave starting blocks and lane ropes.