Construction of 25 metre x 12.4 metre 6 lane heated, school competition pool.
July 2010
25m x 12.4m wet deck
Surface area: 310 sq.metres
Volume: 598,000 litres
Filtration: 2 no. Waterco M3750 sand filters
Pumps: 2 no. Davey 125x100 - 200 7.5kw pumps
Sanitation: Ecoline FSRC - 400
PH Control: HCLORP & PH
Monitoring: Aquarius
Dosing: Alldos
Heating: Accent HWP 150/3
Fully tiled Metz Klinkasire
Wet Deck Grating: Antiwave
Starting Blocks: Pooldeck
Ladders: Pooldeck
Lane Ropes: Antiwave
Blankets and rollers: Sunbather
Working in conjunction with Multi Span Australia, Baldwin Aquatic constructed a new 25m, 6-lane pool swimming pool for this girls’ school in Brisbane’s inner north. The existing pool was built in the 1930s, and the new pool – with its 2.0 depth over 20 metres – now caters for the school’s strong water polo program. The pool is heated and fully tiled in Metz KlinkerSire tiles.