Construction of 25 metre x 20 metre 8 lane heated, school competition pool.
March 2007
25m x 20m wet deck
Surface area: 500 sq.metres
Volume: 828,000 litres
Filtration: 2 no. Chadson MHS3000 sand filters
Pumps:2 no. Aquaplus 7.5kw pumps
Sanitation: Chlorine
PH Control: CO2ORP & PH
Monitoring: Aquarius
Dosing: Alldos
Heating: Accent HWP 200/3
Tiles: MetzInterior surface: 1-2 mm quartz pebble
Wet Deck Grating: Antiwave
Starting Blocks: Pooldeck
Ladders: Pooldeck
Lane Ropes: Antiwave
Blankets and rollers: Sunbather
Baldwin Aquatic was commissioned to construct a new 25m pool at Padua College in Brisbane’s inner north, to replace the tired, leaking original. The new pool, which was constructed on the original site, now has 8 lanes and provides a facility for squad training, as well as learn-to-swim and physical education classes. Metz vitrified tiles were used on the wet decks, hobs, waterline, lanes and targets, with 1-2mm pebblecrete providing a cost-effective, durable interior surface.