Redcliffe Leagues Club, Redcliffe

Back
Redcliffe Leagues Club, Redcliffe Thick blue line

Type:

Aquatic Centres

Project:

Construction of 25 metre x 20 metre heated lap pool, hydrotherapy and learn to swim pool.

Completion:

September 2008

Pool:

25m x 20m wet deck
Surface area: 500 sq.metres
Volume: 565,000 litres

Water Treatement System:

Filtration: 2 no. Chadson MHS3000 sand filter
Pump:2 no. Aquaplus 5.5kw pump
Sanitation: Chlorine
PH Control: AcidORP & PH
Monitoring: Aquarius SE100WP
Dosing: Alldos
Heating: Accent HWP 200/3Heated

Pool Finish:

Tiles: MetzInterior surface: 1-2 mm quartz pebble

Pool Furniture:

Wet Deck Grating: Antiwave
Ladders and Handrails: Custom made 316 stainless steel

A joint project involving the council and state government, the centre features a complex set of disabled ramps that separate two different bodies of water.

This 25m x 20m heated lap pool, plus a hydrotherapy/learn-to-swim pool, was completed by Baldwin Aquatic in September 2008. A joint project involving the council and state government, the centre featured a complex set of disabled ramps that separated two different bodies of water, heated to different temperatures. This enabled the two pools to give the impression of one body of water. The pools also boasted custom-made, stainless-steel ladders and handrails, with the interiors finished in 1-2mm quartz pebble.