Greg Cruickshank Aquatic Centre

Moranbah

3.JPG
 Baldwin Aquatic was commissioned to refurbish the Greg Cruickshank Aquatic Centre in Moranbah, which included works on the existing 50m six-lane pool, and new inclusions of a 25m heated pool and a zero-depth Waterplay area. An impressive filtration room was built to house an Ecoline Chlorinator and filtration systems for both pools and Waterplay area. The $6.5 million dollar project opened to the public on the 26th Janurary 2012. 

Baldwin Aquatic was commissioned to refurbish the Greg Cruickshank Aquatic Centre in Moranbah, which included works on the existing 50m six-lane pool, and new inclusions of a 25m heated pool and a zero-depth Waterplay area. An impressive filtration room was built to house an Ecoline Chlorinator and filtration systems for both pools and Waterplay area. The $6.5 million dollar project opened to the public on the 26th Janurary 2012. 